SSH EnergyStorage Sourcing
HOME / NIGERIA

Battery storage for Nigerian installers and distributors.

Hybrid storage for unstable grid and diesel-backed sites, with model-level documents and a clear split between what we supply and what your importer must clear.

What we supply

Three product lines, matched to the site — not to a brochure.

Every line is quoted against the exact model, the phase configuration and the documents that exist for that model. If a document is missing, we say so before you order.

/ 01 — RESIDENTIAL

SH-Home · all-in-one storage

All-in-one residential storage in roughly 5 / 10 / 16 kWh tiers with a built-in inverter. Selected models carry EN IEC 62619:2022 and IEC 62109-1/-2 documentation; the exact list is sent per model, including what is not held.

View SH-Home →
/ 02 — HYBRID INVERTER

SH-Inverter · 6 / 8 / 12 kW

Single-phase hybrid inverters with IP65 enclosure options, matched to the battery and the site's phase arrangement. Three-phase configurations are confirmed per model.

View SH-Inverter →
/ 03 — MODULAR

SH-Stack · 5.12 kWh modules

Stacked low-voltage modules for larger backup or project requirements, sized by duty cycle and recharge power rather than by headline capacity.

View SH-Stack →
Nigeria · the paperwork that decides the project

Know where SONCAP sits before you commit.

Regulated products need documents that depend on the HS code and the shipment. We state what exists per model instead of pre-claiming a certificate.

01 · SONCAP
Product and Shipment Certificate

Whether your HS code is in scope is confirmed per model and per shipment. We tell you what the factory holds and what the process needs.

02 · CUSTOMS
Form M and PAAR

Usually part of the import file. The importer of record carries the obligation; we supply the commercial and technical documents.

03 · INSTALL
Local sign-off

A qualified local installer signs off the installation. We coordinate documents and factory escalation, not labour.

04 · TRANSPORT
UN 38.3 and MSDS

Test summary and MSDS are needed for the battery shipment; carrier acceptance is confirmed per route.

Commercial & industrial

Beyond residential: C&I and containerised storage

For factories, estates and mini-grids, the same desk sources containerised systems from 150 kWh to 1 MWh. The questions change — duty cycle, cooling, grid code and project documentation — so these are quoted per project, not from a list.

See the C&I range · Document status

How it works

Four steps, in writing.

01 · SUBMIT
Site and model

Load, phase, destination and the model you have in mind.

02 · VERIFY
Documents

We send what exists for that exact model, including gaps.

03 · QUOTE
Incoterm and price

EXW, FOB or CIF, stated in writing with validity.

04 · SHIP
Documents and follow-up

Packing, UN 38.3 and the after-sales path for the batch.

Straight answers

Questions buyers actually ask.

Is SONCAP included in your price?

No. SONCAP is issued through the SON process and depends on the HS code and the shipment. We tell you what the factory holds and what the process needs; the certificate is not a product feature.

Can you ship to Lagos?

Yes, we quote CIF Lagos or FOB China per shipment, subject to the carrier accepting the battery class and the documents.

Do you offer credit terms?

No. First orders are prepaid or against an agreed deposit; credit is a separate commercial decision and is never assumed.

Can you supply a sample before a container?

Yes. A sample order is the normal first step; the quantity and documents are agreed in writing before it ships.

Request a quotation

Send the model, the quantity and the destination.

We reply with the document list for that model and a written quotation. No public price list, no invented lead times.

Start on WhatsApp

Email opens your mail app with the details pre-filled to jimmy@sunhongenergy.com. WhatsApp opens a chat with the same details pre-filled — use whichever you actually check.